DM ENGINEERING
연도별가나다순 전체보기사장교현수교

Geumgang Bridge 4 금강4교
노선명Geum-Gand Bridge 4   연도2009
연장835m (125+260+145+2@110+85)   폭원33.3~36.3m
형식Cable Stayed Bridge   구분Highway Bridge



Baekjeon Bridge 백전교
노선명Damyang-Seongsan   연도2008
연장1,008m (115+15+130+11@68)   폭원24.3m
형식ILM Girder   구분Highway Bridge



Gyodong Bridge 교동대교
노선명Gyodong Island   연도2008
연장310m (72.5+165.0+72.5)   폭원13.8m
형식Cable Stayed Bridge   구분Highway Bridge



Onsoo Bridge 온수대교
노선명Gwangmyeong-Seoul   연도2007
연장785m (30+75+4@125+113+67)   폭원31.84m
형식PSC Box Girder   구분Highway Bridge



Songwon Bridge 송원교
노선명Detour(1st section) of the Street No.1   연도2007
연장110m (30+50+30)   폭원26.90m
형식Double Tee Rahmen   구분Highway Bridge



 1 2 3 4 5 6 7 8 9 10 

DM ENGINEEREING Co.,Ltd.
Head office : Daol bldg, 51, Sangil-ro 6-gil, Gangdong-gu, Seoul, Korea, 134-838
Tel : +82-2-2224-4800  |  Fax : +82-2-2224-4888
Copyright © 2011 DM ENGINEERING. All rights reserved.