DM ENGINEERING
연도별가나다순 전체보기사장교현수교

Dandeong Bridge 단등교
노선명Gogunsan Islands   연도2009
연장400m (cable 425+280=705m)   폭원20.0m
형식Suspension Bridge   구분Highway Bridge



New Millennium Bridge 2 천오대교
노선명Aphae-Amtae   연도2009
연장3,640m (80+2@120+...+11@120+80)   폭원12.5~12.7m
형식Cable Stayed Bridge   구분Highway Bridge



Pyeongtaek Bridge 평택대교
노선명Yongin-Chungbuk   연도2009
연장1,110m (43.75+5@72.5+...+43.75)   폭원30.9m~32.2m (6 Lanes)
형식Cable Stayed Bridge   구분



Baekseok Bridge 백석교
노선명Cho-ji Grand Bridge-Incheon   연도2009
연장751m (2@60+214+62+...+60+55)   폭원32.2~34.7m
형식Cable Stayed Bridge   구분Highway Bridge



Geumgang Bridge 4 금강4교
노선명Geum-Gand Bridge 4   연도2009
연장835m (125+260+145+2@110+85)   폭원33.3~36.3m
형식Cable Stayed Bridge   구분Highway Bridge



 1 2 3 4 5 6 7 8 9 10 

DM ENGINEEREING Co.,Ltd.
Head office : Daol bldg, 51, Sangil-ro 6-gil, Gangdong-gu, Seoul, Korea, 134-838
Tel : +82-2-2224-4800  |  Fax : +82-2-2224-4888
Copyright © 2011 DM ENGINEERING. All rights reserved.