DM ENGINEERING
연도별가나다순 전체보기사장교현수교

Seongsan Bridge 2 제2성산대교
노선명Sangam-Yangpyung   연도2001
연장380m (90+200+90)   폭원44.0m
형식Cable Stayed Bridge   구분Highway Bridge



Geogeumdo Bridge (StepⅠ) 거금도연도교 1단계
노선명Geogeumdo bridge Construction (StepⅠ)   연도2001
연장690m (70+6@77.5+2@77.5)   폭원12.7~15.7m
형식Girder Bridge   구분Highway Bridge



Jindo Bridge 2 제2진도대교
노선명Jindo Bridge 2   연도2000
연장484.0m (70+344+70)   폭원12.550m
형식Cable Stayed Bridge   구분Highway Bridge



 11 

DM ENGINEEREING Co.,Ltd.
Head office : Daol bldg, 51, Sangil-ro 6-gil, Gangdong-gu, Seoul, Korea, 134-838
Tel : +82-2-2224-4800  |  Fax : +82-2-2224-4888
Copyright © 2011 DM ENGINEERING. All rights reserved.